Inter-Array Cables

The volume and scale of opportunity for FLOW is unprecedented - but with major  challenges. Especially when compared to a Fixed Offshore Wind installation.

It will require:

- Using existing products in new environments (loading, configuration/arrangement etc)

- Challenging the cost point of previously ‘gold plated’ oil and gas technologies

- Innovating solutions to install high volumes of standardised products

- Generating a wide demand of skill and services which currently only exist in niche pockets

FLOW will need to provide industrialised solutions, (reliability, cost and production volume) - a huge challenge for un-proven technology

(Morek)

hero
thumbnail
thumbnail
thumbnail
Pitch In
Resources
Connect
Opportunities
Hungry to grow, hungry to win
A Celtic Sea Power Product